Become a Member

In the thick of it, or just watching?

Switzerland is internationally in “pole position” when it comes to handling fusion fuel — but the race has already begun. We can still decide, in the short term, whether to take part or just watch. The future needs your support.

Contact

smolsys AG
Daniel Jakob
Platz 4, 6039 Root D4
041 510 87 50
daniel.jakob@smolsys.comwww.smolsys.com
MC&P, Mueller Consulting & Partner
Fredy Müller
Pilatusstrasse 34, 6003 Luzern
044 433 04 00
f.mueller@mcp-consulting.chwww.mcp-consulting.ch

Member Area

For Cluster members: access to open tenders, the full company and contact directory with matching, and up-to-date news from research and industry — including two-factor authentication login. Terms are being finalized (see Terms & Conditions).

Cluster 3 funding requirement

CHF 35.9 million
Estimated cost over 10 years
CAPEXCHF 16.4 million
  • Labs: Analytics / Tritium / Beryllium / Lithium (4 containers)CHF 12.0 million
  • Analytics, equipment, officeCHF 3.0 million
  • MaterialsCHF 0.7 million
  • Disposal (end of life)CHF 0.4 million
  • Licenses, setup, environmental study, documentationCHF 0.3 million
OPEXCHF 1.95 million / year
  • OperationsCHF 1.2 million
  • Personnel (3 FTE)CHF 0.45 million
  • Rent (600 m² @ CHF 250/m²)CHF 0.15 million
  • Security servicesCHF 0.15 million

Sources: “Fusion Fuel Cluster 3 Präsentation” (smolsys AG / MC&P, 2026); “Fuel Cycle Technology Mapping 2025” (Fusion for Energy / EUROfusion, v2.1, July 2025).